Projects
Compressor Equipment
Cryogenic Equipment
Spherical Tanks Cryogenic Pumps Oxygen Fittings Made of Stainless Steels
Block-Modular Equipment
Automation
Services
About Company
Contacts

RFID “LUCH” System for Logistics and Large Cargo Tracking and Management

Task

• Shipment of materials and equipment for VRU-20 from Hangzhou Oxygen Plant Group Co., LTD (Hangyang), Hangzhou, China, to the site of OJSC “NLMK”. • Delivery of automation and control system (ACS) equipment for VRU-20 from the production site of LLC “RusGazKrio”, ORP, Krasnodar, to the site of LLC “NLMK”.

Client

LLC “NLMK”, Lipetsk, Russia

Purpose

• Accounting and tracking the location of equipment and materials (supplier warehouse, temporary storage warehouse, construction site)
• Accelerated inventory – control of the availability and quantity of equipment and materials (tracking cargo units, packing list, etc.)
• Automatic accounting and write-off of equipment and materials upon receipt and removal at control points
• Matching products, equipment, and materials with drawings, instructions, and other documentation required during construction

Integration with enterprise management and accounting systems

Results

Metal structures (panels, stairs, and platforms of the cold block), boxes with fasteners for metal structures, wooden crates with refrigeration units and consumables for their installation, as well as packaged equipment and boxes with additional equipment, were all labeled.
At the stages of shipment, delivery, and supply, equipment labeling ensured full traceability of all processes and guaranteed order completeness. Additionally, labeling with tags allowed the collection of comprehensive information about the finished product, including packing lists, design documentation, photo reports, drawings, and other materials.

Prospects for Customer Use

· At the stages of shipment, delivery, and supply: labeling with tags provided the ability to store complete information about the composition of the finished products (packing list, design documentation, photo report, drawings, etc.).
· At the acceptance stage: tracking the completeness of the delivery, status, receipt at the warehouse, movement on site to the installation location, assignment of responsible personnel, etc.
· At the construction and commissioning (C&CM) stage: display of design documentation for each item, status of work, when and by whom the equipment was transferred and received by the general contractor, etc.
· At the construction and installation stage: drawings for each item, status of work, when and by whom the equipment was transferred and received by the general contractor, etc.

Similar completed projects

View all projects→